Terminal “C” (“B”) of Kyiv International Airport
Location: the territory of the former Zhulyany Airport, Kyiv, Ukraine
Area: 5,000 sq.m
Chief Architect: Eugene Baranov
Term of works: 8 months
Year: 2013
UVT GROUP designed and installed engineering systems — heating, ventilation and air conditioning.
The air conditioning and ventilation system is based on Chiller & Fan Coil and includes heat pumps and Free Cooling, which ensures maximum efficiency and energy savings.
Thanks to such projects, the company’s specialists have experience not only in design, but also in installation, commissioning and maintenance of systems for 10 years.